What does a renovation project manager do?

The renovation project manager is the person who keeps a project moving. This guide covers their work before the first hammer swings, what they handle once construction starts, and how they fit with the rest of your team.

The Mayland Heights basement opened up during construction, with exposed floor joists, ladders and new foundation walls
Mayland Heights during construction, one of the most complex projects our project managers have run.

What does a renovation project manager do?

A renovation project manager runs the construction side of your project. They coordinate the trades, the schedule, the inspections and the suppliers, deal with whatever comes up on site, and keep everyone talking, including you. When a renovation goes smoothly, it's usually because a good project manager saw the problems coming.

At Kay2, every client has a project manager and a project coordinator from the start of construction to the final walkthrough.

What happens before construction starts?

Much of the work happens before construction day. Drawings, permits, material selections, orders and scheduling all have to be coordinated first, and the project manager is part of that planning.

  • Reviewing the drawings and scope so the crew knows exactly what's being built.
  • Making sure permits are in place before the work that needs them begins.
  • Ordering materials with long lead times, like cabinetry, windows and special-order tile, so they arrive when the crew needs them.
  • Building the schedule, with each trade booked in the right order.
  • Planning site protection, access, dust control and where materials will be stored.

A project manager can only order and schedule what has been decided, so design and selections need to be finished first. Our guide to design-build renovation in Calgary explains why we design first.

What does the project manager do during construction?

  • Coordinating trades, so the framers, plumbers, electricians, drywallers, tilers and finishers each arrive at the right time and in the right order.
  • Booking inspections and making sure the work is ready for them. Work that has to be inspected can't be covered up until it passes.
  • Managing suppliers and deliveries, and following up when something is late or arrives damaged.
  • Checking the quality of the work at each stage, before the next trade covers it.
  • Solving site problems as they come up, from a wall that isn't where the old drawings said to a delivery that can't get down the lane.
  • Keeping you informed about progress, upcoming decisions and anything that affects the schedule or budget.

Why do renovations take longer than planned?

Timelines are affected by inspections, drying and curing times, unforeseen conditions, material lead times and trade availability. Some of these can't be rushed. Concrete and drywall compound need time to cure, and a failed inspection means waiting for a re-inspection.

A good project manager plans for these and keeps you informed. Some delay is a normal part of construction, and you should hear about it early, along with the plan to deal with it. Our guide to how long a renovation takes in Calgary has typical timelines by project type.

What happens when something unexpected turns up?

Mayland Heights basement during construction with new foundation walls, exposed joists and tall windows
On Mayland Heights, the house was supported while about 70 per cent of the old foundation came out.

Renovations open up walls, floors and ceilings, and sometimes what's behind them isn't what anyone expected. Old wiring, rot, a hidden beam or plumbing that isn't to code are common in older Calgary homes, as we explain in what builders find inside older homes.

When that happens, the project manager's job is to stop, assess and explain. On a Kay2 project, you're told what has been found, what it means for the project and what any extra work will cost, and you sign a change order before that work goes ahead.

Who else is on your renovation team?

On a design-build project like ours, each person on the team has a clear part:

  • Your designer plans the space, produces the drawings and 3D renderings and leads your material selections.
  • The project manager runs construction, the schedule and the trades.
  • The project coordinator looks after scheduling details, paperwork and day-to-day communication, so questions get answered quickly.
  • The site supervisor is on site with the crew, making sure the work matches the drawings and the site is safe and organised.
  • The trades and suppliers do the specialised work, with certified trades for electrical, plumbing and gas.

What is your part as the homeowner?

Your biggest job is making decisions on time. Late selections are one of the most common causes of renovation delays, because every choice affects orders and the schedule. Finalize as many decisions as possible before construction begins, answer questions promptly, and keep changes to a minimum once work starts.

It also helps to agree early on how you'll communicate, who your main contact is, and when you can visit the site safely.

What should you ask a contractor about project management?

  • Who will manage my project, and will that person stay with it from start to finish?
  • Who is my day-to-day contact, and how will I hear about progress and decisions?
  • How are inspections and permits handled?
  • How do you handle unexpected conditions, and will I approve any extra cost before the work is done?
  • Who is on site each day, and who supervises the trades?
  • Are your trades licensed and insured, and do you carry WCB coverage and liability insurance?

If you're weighing whether to run the trades yourself, read should you hire a general contractor or manage the trades yourself. Our hiring a contractor guide covers the rest of the checks.

Talk it through with Kay2

Every project starts with a complimentary consultation with one of our estimators.

Watch

Prefer video? Watch the short version.

All videos

Process and planning, 0:45

What happens behind the scenes of a renovation

Drawings, permits, selections, orders and scheduling all happen before construction day, and you hear about any surprise behind a wall before extra work goes ahead.