Specialty Builds
Basketball, pickleball and multi-sport courts you can use in January.
An indoor court turns the longest Calgary winter into a season of play. It's also one of the most demanding rooms to build, because it needs height, a column-free span and a floor that's kind to joints.
Kay2 plans courts as part of the house, in an addition, a lower level or a new build, with the structure, sport flooring, lighting and ventilation designed together.
Local expertise
With snow on the ground for much of the year, an indoor court gives Calgary families somewhere to play basketball, pickleball or volleyball every month of the year.
Courts need clear height and wide, column-free spans, so in Calgary they are usually built in an addition, a new lower level or a new home, often on larger lots in communities such as Springbank. Kay2 handles the structure, permits and finishes as one project.
Why build it with Kay2
The concerns we hear most are budget creep, timelines slipping and nobody taking ownership. This is how we prevent them.
BILD Calgary Region's top renovation honour in 2018 and 2022, plus a CHBA national award.
Design, estimating, project management and construction all happen inside Kay2, so you deal with one company from start to finish.
Your project is designed and priced first, and you get a guaranteed price before you sign a construction contract.
Every client gets a project manager and a project coordinator, and any change is explained and signed before the work is done.
Hiring separately
Kay2 design-build

Planning indoor sport courts in Calgary?
Start with a free consultation at your home.

We walk through the house with you and talk about how you want to live in it, what has to be included and what you would like to change. The first visit is free.

An estimator turns your wish list into a written scope and a budget, explains where the money goes and talks through financing if you need it.

Our designers draw the plans, and you choose your cabinets, stone, tile and lighting with them at the Showroom. Permits and material orders are lined up before any work starts.

The crew builds to the drawings on a site that is protected and cleaned regularly. A project manager and a project coordinator stay with you, and if we find a surprise behind a wall, we show you and get a change order signed before we do the work.

At the end we walk through the house with you, finish the inspections and only sign off when you are happy with it. Your 5-year limited warranty starts from there.
Every Kay2 project is priced to its scope. After design you receive a detailed, fixed-price proposal.
Your schedule is set before construction begins, including permits and material lead times, and your project manager and coordinator keep you up to date throughout.
Kay2 work comes with a 5-year limited warranty. Kay2 is bonded and carries $5 million in liability insurance, and under Alberta's prepaid contractor rules you can cancel within 10 days of receiving your copy of the signed contract.
Free guide, 2026 edition
The Calgary Renovation Cost Guide 2026 gives real price ranges for kitchens, bathrooms, basements, additions and whole-home renovations, and the hidden costs people forget to plan for.
Your first step
Yes. Kay2 designs and builds indoor courts for homes in Calgary and nearby communities such as Springbank, usually as part of an addition, a new lower level or a new home.
Usually in a purpose-built addition or a new lower level, because courts need more clear height and span than standard rooms. We assess your lot and structure at the consultation.
Kay2 builds the room itself, including the structure, clear height, sport flooring, lighting, ventilation and finishes. Hoops, nets and other equipment are coordinated with your preferred supplier and installed once the room is ready.
It depends on the sports you play. Multi-sport tile and sprung hardwood systems are common. We specify the flooring with you during design.
Yes. Courts are often planned alongside a gym, change room or viewing lounge as one recreation level.
Service area
Kay2's award-winning and award-finalist work includes homes in Bankview, Rutland Park, Stanley Park, Southwood, Mayland Heights and Bridgeland in Calgary, in Lower Springbank, and on Chestermere Lake. We work across Calgary's inner-city and established neighbourhoods and in nearby Chestermere, Springbank, Airdrie, Okotoks, Cochrane, Strathmore, Canmore and Banff. Every project is planned from our Showroom and Design Centre at 3336 47 Ave SE, Calgary.
Renovations in Chestermere Renovations in Springbank Renovations in Airdrie Renovations in Cochrane Renovations in Okotoks Renovations in Strathmore Renovations in Canmore Renovations in Banff
More specialty builds